Accountability (71) Adequate documentation (7) ADR in procurement (4) Allocation of risks (6) Best interest of government (11) Best practices (19) Best value (15) Bidder prejudice (11) Blanket purchase agreement (1) Bridge contract (2) Bundling (6) Cancellation and rejection (2) Centralized procurement structure (12) Changes during bid process (14) Clarifications vs Discussions (1) Competence (9) Competition vs Efficiency (29) Competitive position (3) Compliance (35) Conflict of interest (32) Contract administration (26) Contract disputes (4) Contract extension or modification (9) Contract formation (1) Contract interpretation (1) Contract terms (3) Contract types (6) Contract vs solicitation dispute (2) Contractor responsibility (20) Conviction (4) Cooperative purchasing (3) Corrective action (1) Cost and pricing (13) Debarment (4) Determinations (8) Determining responsibility (37) Disclosure requirements (7) Discussions during solicitation (10) Disposal of surplus property (3) Effective enforcement requirement (35) Effective procurement management (5) Effective specifications (36) Emergency procurement (14) eProcurement (5) Equitable tolling (2) Evaluation of submissions (22) Fair and equitable treatment (14) Fair and reasonable value (23) Fiscal effect of procurement (14) Frivolous protest (1) Good governance (12) Governmental functions (27) Guam (14) Guam procurement law (12) Improper influence (11) Incumbency (13) Integrity of system (31) Interested party (7) Jurisdiction (1) Justification (1) Life-cycle cost (1) Limits of government contracting (5) Lore vs Law (4) market research (7) Materiality (3) Methods of source selection (33) Mistakes (4) Models of Procurement (1) Needs assessment (11) No harm no foul? (8) Offer & acceptance (1) Other procurement links (14) Outsourcing (34) Past performance (12) Planning policy (34) Politics of procurement (52) PPPs (6) Prequalification (1) Principle of competition (95) Principles of procurement (25) Private vs public contract (17) Procurement authority (5) Procurement controversies series (79) Procurement ethics (19) Procurement fraud (31) Procurement lifecycle (9) Procurement philosophy (17) Procurement procedures (30) Procurement reform (63) Procurement theory (11) Procurement workforce (2) Procurment philosophy (6) Professionalism (17) Protest - formality (2) Protest - timing (12) Protests - general (37) Purposes and policies of procurement (11) Recusal (1) Remedies (17) Requirement for new procurement (4) Resolution of protests (4) Responsiveness (14) Restrictive specifications (5) Review procedures (13) RFQ vs RFP (1) Scope of contract (16) Settlement (2) Social preference provisions (60) Sole source (48) Sovereign immunity (3) Staffing (8) Standard commercial products (3) Standards of review (2) Standing (6) Stays and injunctions (6) Structure of procurement (1) Substantiation (9) Surety (1) Suspension (6) The procurement record (1) The role of price (10) The subject matter of procurement (23) Trade agreements vs procurement (1) Training (33) Transparency (63) Uniformity (6) Unsolicited proposals (3)

Wednesday, December 11, 2019

How do you determine prospective contractor responsibility if you don't know who the contractor really is?

The ABA Model Procurement Code, as do most other procurement regimes, require the government to know who it is doing business with.  "It is important that the bidder of offeror will be a responsible contractor -- that the contractor has the financial ability, resources, skills, capability, and business integrity necessary to perform the contract."  (MPC 3-401, Comment 1)

"The unreasonable failure of a bidder or offeror to promptly supply information in connection with an inquiry with respect to responsibility may be grounds for a determination of nonresponsibility with respect to such bidder or offeror".  (MPC 3-401(1))

Since the time the MPC was enacted in 1979, other laws were being developed to facilitate cloaks of invisibility for entities to hide the identities of the money, ownership, assets and control of  businesses organized under such laws.  The most recent has been the promulgation of a Uniform Limited Liability Company Act (ULLCA) in 1995.  Use of LLCs to provide ownership anonymity of assets, and businesses, is easy (see "How to Hide Ownership of a Company?") and notorious (see, "Anonymous Owner, L.L.C.: Why It Has Become So Easy to Hide in the Housing Market").  The ULLCA, both in original form and in a revised 2006 Model, has been adopted on Guam and many U.S states.

This is becoming a problem, both in the U.S. and Europe, and presumably elsewhere, as indicated in the following article published by the Association of Certified Financial Crime Specialists (ACFCS):

Report roundup: EU calls U.S. a ‘secrecy haven,’ GAO highlights commercial owner opacity, and more, posted March 16, 2017.
This week’s Report Roundup has a common theme running through hundreds of pages of reports: the risk of opaque ownership structures and how, in the United States and beyond, the inability for countries to collect beneficial ownership information is a magnet for bad actors.

In the U.S., that means a major ally in the European Union (EU) calling out a longstanding gap in the country’s anti-money laundering (AML) defenses: the federal government allowing certain states like Delaware to sell corporate secrecy as a service – an ultimate irony as this country aggressively chases and chastises other jurisdictions for doing the same thing, according to the report.

That vulnerability is made doubly dangerous when it intersects the international trading sector due to the knowledge that organized criminal groups, corrupt kleptocrats and terror financiers currently hide, funnel and legitimize trillions of dollars in illicit gains, per estimates, through a myriad of trade trickery, including under and over-invoicing items, falsifying documents and other tactics.

In that same vein, U.S. government watchdog group the Government Accountability Office (GAO) noted in a report that because this country doesn’t broadly require ownership information to be made available, that can open the door to national security risks when government operations are housed in buildings owned by foreign entities who may or may not be a shell for prying, spying eyes bent on espionage.

Lastly, another report by United Nations Security Council highlighted that the issue of anonymous shell companies globally allows rogue regimes like North Korea to flout international sanctions and get access, as analysts prognosticate, to banned technology and weapons systems on its path to wreak worldwide havoc by creating weapons of mass destruction.
The article goes on to elaborate on some of those reports.

It is interesting that the article mentioned a report by the U.S. Government Accountability Office (GAO), being critical of lack of ownership information in the national security context, because the GAO has now, again, turned its eyes to the subject, in the context of procurement, in its November 2019 report below.  In its letter to Congress transmitting the report, it noted, 
DOD awards contracts to companies in the private sector to provide a wide variety of services for U.S. military forces. Of the thousands of contractors doing business with DOD, some companies are what are known as shell companies — that is, companies that exist but conduct either no business or minimal business. Shell companies can be used for legitimate purposes; for example, they may be formed to obtain financing before starting operations. However, companies sometimes use shell companies to form opaque ownership structures designed to disguise the beneficial owner — the natural person or persons who directly or indirectly own and control, or receive substantial economic benefit from, a company.

These opaque ownership structures can be used to facilitate fraud and other unlawful activity in commerce, including contracts with DOD. For this report, we define opaque ownership as structures of business governance that may conceal or obfuscate entities or individuals who own, control, or benefit financially from a business.
Ongoing DOD Fraud Risk Assessment Efforts Should Include Contractor Ownership  (some excerpts of the letter an other parts of the report, sliced and diced to meet the didactic goal and limited space of this blog; you should read the whole report for original meaning and intent):  In the letter mentioned above, it further noted:
We researched legal databases and news articles involving DOD contractors to identify federal court cases and agency decisions. We reviewed GAO bid-protest decisions to identify cases in which contractors may have failed to disclose foreign ownership or concealed beneficial-owner information to obtain contracts that they were not eligible to receive.  We examined known risks identified through our case-study research and interviews with DOD officials.  We further examined the risk that contractors could be disguising their ownership to create the appearance of competition.

We contacted several government contractors’ associations to gain members’ perspectives on reporting beneficial ownership information and received feedback from 16 members of three government contractors’ associations. The perspectives gained from our queries are not generalizable to all contractors.
In the body of the report, GAO found:  
As the number of layers of ownership increases, ownership information becomes more opaque. This opacity can make it difficult for DOD to determine which entities and individuals ultimately own or control its contractors.

In the United States, no centralized information source or national registry maintains company ownership information. In 2014, the National Association of Secretaries of State found that most states collect minimal ownership data. The association reviewed key information collected by the 50 states and the District of Columbia during the entity-formation process and in annual or periodic reports. During both the entity-formation process and in annual or periodic reporting, the association found that very few states collect some form of entity ownership or control information from limited liability companies or corporations.  The Securities and Exchange Commission collects some ownership information on publicly traded companies. Any person or group of persons that acquires beneficial ownership of more than 5 percent of a publicly traded company’s registered voting securities must register.

GSA’s System for Award Management (SAM) is a federal government-wide database for vendor data that is used across all federal agencies. Any entity that wishes to do business with the government must register in SAM to be eligible to receive a contract award, except in specific circumstances. To increase procurement transparency and traceability, entities that wish to do business with the federal government are now required to provide additional ownership information through the annual registration process in SAM. The required ownership information includes the “immediate” and “highest” level ownership of an offeror.

Responsibility Determination

Contract award decisions are based on evaluation factors and significant subfactors that are tailored to the procurement, at the discretion of procurement officials. At a minimum, these factors must include: price/cost, quality, and past performance. A prospective contractor must affirmatively demonstrate its responsibility, including, when necessary, the responsibility of its proposed subcontractors. Contracting officers must then determine the responsibility of prospective contractors, including whether prospective contractors can perform the terms of a contract. To be determined responsible, a prospective contractor must have adequate financial resources to perform the contract (or the ability to obtain them); be able to comply with the required delivery or performance schedule; have a satisfactory performance, integrity, and ethics record; have the necessary organization, experience, accounting and operational controls, and facilities to carry out the contract (or the ability to obtain them); and be otherwise qualified and eligible to receive an award under applicable laws and regulations.

Before awarding a contract over the simplified acquisition threshold, a contracting officer must review the prospective contractor’s performance and integrity information available in the Federal Awardee Performance and Integrity Information System (FAPIIS). FAPIIS is a federal government-wide database designed to assist contracting officers with making a responsibility determination by providing integrity and performance information of covered federal agency contractors and grantees. FAPIIS provides a prospective contractor “Report Card” that includes information pertaining to the prospective contractor’s past performance (if applicable), such as any administrative agreements, contract terminations, nonresponsibility determinations, and exclusions, among other things. It also includes the ability to view the company relationship information, which details the ownership information that prospective contractors are required to report in SAM. When making a responsibility determination, the contracting officer must consider all the information available through FAPIIS with regard to the prospective contractor and any immediate owner, predecessor (an entity that the prospective contractor replaced by acquiring assets and carrying out affairs under a new name), or subsidiary identified for that prospective contractor in FAPIIS. The contracting officer must document in the contract file how the information in FAPIIS was considered in any responsibility determination, as well as the action that was taken as a result of the information.

Contractors with Opaque Ownership Pose Financial Fraud Risks Including Price Inflation

Concealing relationship with subcontractor to inflate prices. Contractors can subcontract with companies they own or control to inflate prices for financial benefit. For example, in one case the contractor purchased goods from a company that its owners created, controlled, and used to make fraudulent markups appear legitimate. Contractors or subcontractors can also bill for work not performed by creating fictitious invoices that add costs to a contract. For example, in four court cases we examined, multiple DOD subcontractors were actually shell companies that did not have the inventory they purported to ultimately provide to the government or perform the work indicated in the contract requirements. Contractors or subcontractors can conceal conflicts of interest for financial benefits. For instance, in one case a DOD contractor employee and his spouse formed a company and concealed their interests by not listing their names but listing the names of family members on formation documents. This company became a subcontractor to the company that employed the DOD contractor. The contractor employee, in his official position, wrote letters justifying awards of purchase orders to the subcontractor he owned and approving recommendations that the awards be made to the subcontractor. The co-owner of the subcontractor concealed her involvement by signing contracts using a different name. We also identified the potential risk of companies creating the appearance of competition by submitting bids from fictitious companies. We identified one case that involved a DOD contractor whose executives admitted as part of their plea agreements to creating fictitious, inflated bids that were not from actual businesses to ensure that the contractor’s own bid would be selected by DOD as the supposed lowest.

Contractors with Opaque Ownership Can Also Pose Nonfinancial Fraud Risks


Contractors can pose nonfinancial fraud risks to DOD by concealing their ownership structure to bid on and obtain contracts that they are not eligible to receive. These nonfinancial risks may not pose a direct financial cost to DOD, but they can allow ineligible companies to contract with DOD while potentially denying eligible companies from contracting with DOD. These risks can also lead to additional vulnerabilities. One contractor that fraudulently obtained set-aside contracts claimed it was owned by a service-disabled veteran; however, that veteran had virtually no involvement with the contractor. Some contractors have been found not eligible to receive the set-aside contracts because they were not at least 51 percent controlled by the eligible individuals and the eligible individuals did not make long-term decisions for the companies. Rather, the contractors were controlled by an ineligible individual who owned and controlled a separate company that actually performed work on the set-aside contracts.

Contractors with opaque ownership structures can also pose the risk of circumventing eligibility requirements for contracts that are only designated for domestic companies, which can lead to other vulnerabilities that affect warfighter readiness. We identified four cases in which individuals created domestic shell companies for foreign manufacturers and bid on contracts designated for domestic companies. In three of the four cases, the individuals behind the shell companies also had ownership interests in the foreign manufacturing companies. Foreign manufacturers received payments from the contracts, despite the contracts only allowing domestic manufacturers to be eligible, and one such manufacturer ultimately supplied DOD with defective and nonconforming parts that led to the grounding of at least 47 fighter aircraft.
I'm sure you get the drift here. There's much more in the GAO report, much more. Have a look. Of particular importance is the lengthy discussion of things that are needed to improve the system of contractor selection. In brief, in its conclusions, the report summarizes,
We recognize that collecting additional ownership information, including beneficial-ownership information, could pose compliance burdens for contractors; and regulatory trends have generally focused on easing the burden to do business. Additionally, verifying contractor ownership can be challenging and time-consuming. Nevertheless, having a thorough assessment of contractor-ownership risks will better position DOD to make informed decisions on how best to use its resources and help ensure that the department’s fraud risk management program is organized and targeted to manage risks in a prioritized manner.

POST SCRIPT: In another new development along the lines of tracking who is whom, note the following article reprinted in Lexology:

Government Contractors Beware: DOJ Announces Creation of Interagency Procurement Collusion Strike Force
On November 5th, the Department of Justice (“DOJ”) Antitrust Division doubled down and announced the formal launch of the Procurement Collusion Strike Force (“PCSF”), an interagency partnership consisting of prosecutors and investigators focused on deterring, detecting, investigating, and prosecuting antitrust crimes, such as bid-rigging conspiracies and related fraudulent schemes in government procurement, grant, and program funding.





Tuesday, June 18, 2019

Unilaterial termination of government contract: fettered or convenient?

There is, in this post, a bit of a red herring. I will be comparing failures of a government to perform an admitted contract, and the effect of the contract obligation on the validity of the contracted obligation. Actually, the compared situtations are distinguishable on their facts, but the common notion is one of governance issues one necessarily encounters when contracting with a government. Thus, this is more a case of contrasts, not comparisons at a certain level, but a teachable moment nevertheless (I hope).

Note that I regularly, with no disrespect intended, slice and dice, reorganize, paraphrase, leave out critical facts and citations, and generally make a mess of the original source to fit the available space and the point to be made in a post. So, always, always, go to the source; read the original at the link and don't get misled by my wayward rendition.

The impetus of this post is the Australian appellate case captioned Searle v Commonwealth of Australia [2019] NSWCA 127, decided May 31, 2019. A good nutshell discussion of the case is provided by Dr Nick Seddon, an honorary professor at the Australia National University College of Law, on the Australian Public Law blog. Dr Seddon is an accomplished leading authority, and author, on Australian commercial and government contract law. Critically for this blog writer, he writes in a forthright and narrative style that is easy to read and grasp.

Searle v Commonwealth [2019] NSWCA 127 – government contracting and fettering
What happened in Searle?    Searle joined the Navy as a marine technician. After being signed up, he entered into a training contract under which he would undertake a course of training towards a Certificate IV in Engineering. Under it the Navy undertook to provide a training plan and the various components to achieve the Certificate. The Navy failed to provide these elements of training. After leaving the Navy, Searle sued for damages for breach of contract. He argued that, if he had achieved the Certificate, he could have obtained a more remunerative job in civilian life than he in fact got.

There is a special legal background to this story. Going back to medieval times, English law held that the Crown does not enter into contracts with its servants. This applies in Australia although, for the ordinary public service, it has been superseded by elaborate legislation. Not so for the military, or at least not so as to remove the basic proposition that there is no contract between an service member and the Commonwealth. Such members are engaged at her Majesty’s pleasure.

The fettering rule.   When government enters into a contract, there is always a potential tension. To what extent does the contract bind the government in a way that may thwart the government’s task of governing? The answer to this traditionally has been that freedom to govern trumps freedom of contract. Under various labels (executive necessity, the rule against fettering or, more vaguely, sovereign risk) the government must be free to implement its programs and policies even if this causes the government to be in breach of contract. Traditionally, that is too bad for the contractor with no right to a remedy. This collection of principles has generated much controversy over many years, though it arises rarely. The controversy is fully described by Bell P, the lead New South Wales Court of Appeal judge in Searle v Commonwealth.

This tension is captured in a number of propositions (stated starkly here):
1. The government may simply break a contract with impunity;
2. The government cannot contract out of, or relieve the contractor from, existing statutory obligations;
3. The government cannot through a contract fetter its future exercise of executive power;
4. The government cannot through contract commit to future legislation;
5. The government may instigate legislation to override an existing contract.
Propositions 2 and 4 are less controversial and are well-established. Propositions 1 and 3 are controversial and ill-defined. Proposition 5 is well-established but controversial.

The no-fettering argument in Searle:   The Commonwealth said that the basic employment arrangement was not contract but, instead, an exercise of the Crown’s prerogative (or executive) power. Even if the training contract was a separate arrangement, over and above the underlying employment arrangement, the training contract could not fetter the Navy’s prerogative right to direct, control and manage Searle as a military person (dubbed “Navy Command” in the Court of Appeal). This was therefore a proposition 3 (the training contract could not fetter the exercise of Navy Command), or possibly a proposition 1 (the Commonwealth could simply break the training contract with impunity), case. This argument succeeded before the trial Judge.

Appeal:   On appeal, the New South Wales Court of Appeal (the functional equivalent to a Supreme Court in many U.S. jurisdictions) took this opportunity to examine the long-standing controversy about propositions 1 and 3, described as “uncertain” and “ill-defined”. The lead judgment by Bell P was supported by short judgments from Bathurst CJ and Basten JA. It was held that the training contract did not amount to a fetter on the Commonwealth’s executive (or prerogative) power of Naval Command and that the Commonwealth was liable to pay damages.

Space does not allow coverage of the very thorough description and analysis by Bell P of the difficulties and criticisms of the fettering doctrine. Making a government contract almost invariably employs the executive power. The fettering rule says that that contract is void if it purports to dictate or control a future exercise of executive power, including making another contract. If this is correct, it is a public law intrusion on contracting.

The Mason solution:   The consequence of invoking the fettering rule -- the contract that offends the rule is void -- has been one of the strands of criticism of the rule. Voidness is usually chaotic. Many years after the contract is made, a court pulls the rug leaving the parties in a very uncertain position. An important solution to this problem was suggested by way of obiter dicta by Mason J in Ansett Transport Industries (Operations) Pty Ltd v Commonwealth (1977) 139 CLR 54 at 76. This was that the contract is not void but it could not be enforced by coercive orders such as an injunction of specific performance. But, on the other hand, it could be the subject of a damages remedy. This solution preserves the underlying rationale of the fettering doctrine and, at the same time, protects the contractor. It is clear that the denial of the equitable remedies of injunction or specific performance is because of the government’s imperative to be unhindered in its task of implementing its policies and programs -- not for one of the reasons that guides a court’s discretion under the ordinary law of contract.

The training contract:    In Searle the contest was between the training contract and the future exercise of the power of Naval Command. Absent a possible fettering argument, there was no basis for challenging the contract. At a factual level, the training contract simply did not fetter the power of Naval Command. Any resort to Naval Command that detracted from the obligations arising from the training contract did not fetter the Commonwealth in any real sense. Even the possibility of having to pay damages in accordance with the Mason solution would not amount to a practical fetter. The Commonwealth conceded that it had the power to enter into such a contract and did not attempt to argue that it lacked that power, absent a fettering argument.

President Bell, during the course of his wide-ranging examination of the academic and judicial criticisms of the fettering doctrine, was clearly motivated by the fundamental principle that contracts should be kept, not just for the sake of the contractor but also from the perspective of government, because otherwise it would not be a credible commercial player. "This approach is more nuanced than others which carry the crude, often overbroad and instinctively unfair consequence of a contract being treated as void. It is an approach which arguably best reconciles the competing policy considerations."

Conclusion:   This case “raises a number of very important questions of principle” about government contracting, albeit in an area of the law that is rarely litigated. The fettering doctrine, at least arising from propositions 1 and 3, has been festering over many years and is in need of a fresh look and restatement. The Mason solution has been applied for the first time in Australia by the New South Wales Court of Appeal. It strikes a sensible balance between the government’s imperative to govern and its need to make contracts.

Watch this space for a possible appeal to the High Court.

In the U.S., the private law of contract has been undermined and supplanted by statutory laws applicable to government acquisition contracts. In the typical "procurement" government contract, the government is acquiring something. "“Acquisition” means the acquiring by contract with appropriated funds of supplies or services (including construction) by and for the use of the Federal Government through purchase or lease.... Acquisition begins at the point when agency needs are established and includes the description of requirements to satisfy agency needs, solicitation and selection of sources, award of contracts, contract financing, contract performance, contract administration, and those technical and management functions directly related to the process of fulfilling agency needs by contract. 2 FAR 2.101(a) In the Searle case, the government was acquiring nothing.

There was nothing more than an arrangement between the government and an employee that the government would provide a service for an employee. It was something in the nature of, what the U.S. Supreme Court has styled, a "gratuity": "Pensions, compensation allowances and privileges are gratuities. They involve no agreement of parties; and the grant of them creates no vested right. The benefits conferred by gratuities may be redistributed or withdrawn at any time in the discretion of Congress. ... On the other hand War Risk policies, being contracts, are property and create vested rights. The terms of these contracts are to be found in part in the policy, in part in the statutes under which they are issued and the regulations promulgated thereunder." Lynch v. United States, 292 US 571,577, U.S. Supreme Court (1934)

I'm not sure if that is a difference with a distinction between the fettering rules for government contract as practiced in Australia and contract clauses available in U.S. government, and Guam, contracting regulations, but by definition, Searle did not deal with a government contract as we know in procurement. "“Contract” means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements ...." 2 FAR 2.101(a)

Guam's procurement law would not provide jurisdiction for a court to hear the contract claim brought by Searle, because the Guam procurement law does not waive sovereign immunity involving government contracts that are not acquisitions. In Guam, the government has waived sovereignty to be sued under government contracts more generally, but under the Claims Act, and, similar to Searle, the Claims Act only has jurisdiction to render judgement for monetary awards related to expenses incurred "upon a contract", not other monetary damages and it is an open question whether it even applies to to oral or un-written contracts, or to any theories of recovery based in equity, contracts implied in law, quasi-contract, or quantum meruit. The Guam Supreme Court has left to "another day our answer to whether the Guam Legislature has extended the waiver of sovereign immunity to oral or unwritten contracts, or to any theories of recovery based in equity." Guam Police Department v. Superior Court (Lujan) 2011 Guam 8, ftnt 8.

But, to the extent that the authority of the executive branch of the government in the U.S. is impinged upon by the procurement contracting process, the U.S. government and most if not all other jurisdictions in the USA have obtained a bit of flexibility unavailable in private contract law to cope with matters of good public governance, resulting in similar outcomes as in Searle yeilding a sensible balance between the government’s imperative to govern and its need to make contracts, in reliance on the immunity of the 'crown', particular laws and regulations, and the contract between the parties, all in concert, when a void contract is to be avoided.

An example of this is the accepted "Termination for Convenience" clause, which in private law of contracts would normally render the entire contract void as an illusory "bargain". It allows the government to unilaterally terminate a contract for practically any reason short of bad faith or fraud. However, it also requires that the government to compensate the contractor for work done and profits earned to the date of termination. It thus reached a similar outcome as in the Searle case. The termination for convenience clause arose out of the experiences of war, in particular the armistice following hostilities (in the "good old" days of wars between established states), when peace suddenly broke out but war material contracts persisted, without the government's need for more war materiel -- indeed as an impediment to redirecting funds to meet the needs of rebuilding the country.

Another example is the standard contract disputes clause. In simple terms, this clause and implementing regulations provides that contract disputes between the government and a contractor will be decided by the government if the parties are unable to "mutually agree" on a settlement and resolution of the dispute. In the face of this somewhat illusory and certainly conflicted decision making process, the clause contemplates a review of the government's decision, administratively, judicially or both.

This discussion illustrates a point I make when people tell me that government contracting should be done in the same manner as private contracting: government contracting must be conducted with an eye to good public governance as the overriding principle on which the contracting is allowed. It is true that "when the United States enters into contract relations, its rights and duties therein are governed generally by the law applicable to contracts between private individuals". Lynch v. United States, supra, 579, U.S. Supreme Court (1934) Nevertheless, only Congress can determine to allow a cause of action against the government arising under that contract. "The character of the cause of action — the fact that it is in contract as distinguished from tort — may be important in determining (as under the Tucker Act) whether consent to sue was given." Id., at 582 "Specifically, the Tucker Act permits three kinds of claims against the government: (1) contractual claims, (2) noncontractual claims where the plaintiff seeks the return of money paid to the government and (3) noncontractual claims where the plaintiff asserts that he is entitled to payment by the government."

American jurisdictions tend to mitigate the "fettering tensions" discussed above by Dr Seddon with a combination of regulations and contract clauses, coupled with particular waivers of sovereign immunity. And they each, in their separate ways, look for that nuance which strikes a sensible balance between the government’s imperative to govern and its need to make contracts.


Monday, May 27, 2019

When Commercial Off the Shelf became a Cockup Off the Cuff

The Project On Government Oversight (POGO, as it is called) has an interesting, and somewhat disturbing, report out. This post will only go into parts of it. The whole report is well worth the read. Read it at the link below.

The Pentagon relies on the obscure Defense Contract Management Agency (DCMA) to negotiate and administer $5 trillion contracts across the Defense Department as an average of $455 million In taxpayer dollars are paid out each day to contractors. DCMA undertook to modernize its procedures and processes and contracted professionals to design and build a system. The result was a software system created to help review, implement, and track defense contracts a, a project, called the Integrated Workload Management System.

The project appears to have been a colossal cockup. But that, and the investigation it appears to have instigated, is not what this post is focused on. For that story, you must read the POGO report at the link above. The bouncing ball that traces this post is a golf ball that seems never made it onto the fairway; it was in the weeds from the gitgo. This is a tale of “Do as I say, not as I do”.

Pentagon’s Contracting Gurus Mismanaged Their Own Contracts
 In 2011, the agency got the ball rolling with a contract paying a company called Apprio to conduct a study on what a “Model Contract Management Office” would look like and to “identify relevant technology” it would use. The next year, Apprio’s contract was expanded to envision a replacement for the Electronic Document Workflow system.

Things started going south for the software project in mid-2013, when Apprio won a contract worth more than $3 million to begin testing and developing software as the replacement system. But because the agency had previously hired Apprio to help lay out the requirements for this work, under federal acquisition regulations the company was ineligible for contracts implementing its prior recommendations. Regulations specifically prohibit this so that a contractor is not tempted to misrepresent the needs of the agency in order to sell more of its own products or services. The “organizational conflict of interest violation” raised “serious concern over contracting practices and processes within DCMA.”

Because the contract involved spending more than $1 million on a system the Defense Department uses to manage its resources, then-Director of Information Technology Haynes needed approval from the Pentagon’s deputy chief management official. The official rejected Haynes’ initial request, citing missing documentation and other flaws, and asked him to resubmit it. Despite not having the Pentagon’s approval, the contract was awarded to Apprio. But during testing over the next several months, Apprio’s software “failed to properly integrate” with the agency’s other systems.

The agency turned to another company, Discover Technologies, to develop a software solution. It appears that the documents provided to the Services Acquisition Review Board to get approval for the contract were misleading. The documents, submitted just two days before the end of the fiscal year, listed the upcoming year’s projected expenses as $960,000. There was no mention of the estimates that the contract would likely cost up to $40.5 million over its lifetime. Evidently, the Pentagon had not approved the funds necessary to cover that much larger estimate. In the event, the board received and approved the contract on September 28, 2013, and reapproved it each year through 2017.

Additionally, the board failed to conduct a formal review of the Discover Technologies contract before approving it. It didn’t seem to know what the contract was intended to deliver. Personnel consistently did not understand what was being communicated by Haynes and others in the IT department, and therefore either stopped asking questions or failed to ask any at all. In the absence of any questions or objections, approvals were essentially rubber stamps, with the board approving 95 percent of IT submissions on first attempt.

If it had done a thorough review of the Discover Technologies contract before approving it, the review board might have caught numerous problems. For example, the agency used the wrong type of contract: a “Blanket Purchase Agreement,” which is intended for recurring needs for straightforward supplies or services, not the type of complex software modifications Discover Technologies would be performing. The agency mischaracterized the software as a “commercial off-the-shelf” product, which requires less oversight, despite the fact that those involved knew it required a significant amount of coding and development work. The contract’s requirements were also vague, with some overlapping with work already assigned to Apprio. In many cases, task orders within the contract were missing key components, such as statements of work and standards by which to measure performance, and the document detailing the work requirements didn’t include a list of specific objectives.

On the last day of the fiscal year, two days after the review board approved the Discover Technologies contract, the Pentagon approved spending about $6.3 million on the software project over the next year. Hours later, the agency awarded the contract. It appears there was “pressure in contracting to get contracts awarded at year end,” leaving insufficient time to plan and properly craft the project’s requirements. In summary, some of the project’s most significant problems stemmed from the structure and administration of the contract. The lack of clear objectives in the contract directly impacted performance, and the lack of planning and strategic vision led to money being wasted through duplicative work and cost overruns.

Worse, the government did not provide any oversight focused of the project. There were “essentially two budget offices with a separate one in IT, and there was no oversight of the IT budget personnel by the [agency] budget office. This meant the agency’s own budget office didn’t know the agency was spending more money than it was authorized to. In a similar vein, Pentagon budget officials didn’t adequately keep track of the numbers or talk to each other, so one office kept giving away more money than the other had authorized.

The project had become a runaway train until the agency director put a halt to things and requested both an Inspector General audit and an independent investigation into the suspected Antideficiency Act violations. By then, the agency had spent around $45 million on the project, not including government labor costs.

In 2009, the congressionally created Commission on Wartime Contracting wrote, “DCMA is not aggressive in motivating contractors to improve business systems,” which it described as “the first line of defense against waste, fraud, and abuse.” The agency’s “conservative approach results in little, if any, motivation for contractors to improve their business systems, and ultimately has a direct impact on the warfighting mission.” In 2011, the Government Accountability Office attributed many of the agency’s struggles to “a seriously eroded workforce” stretched thin by the surging number and value of contracts in prior years due in part to the wars in Iraq and Afghanistan; a decentralization initiative that led to inconsistent guidance and practices across the agency that one official called a “free for all”; and the challenges posed by defense contractors’ increasing reliance on subcontractors.

While the agency has in many cases not been zealous enough in protecting taxpayer interests, the shortcomings are not across the board, and parts of the agency have at times seemed more willing to hold contractors accountable. The agency’s hard-hitting findings that Lockheed Martin had used a significantly flawed business system for the F-35 program, and the Pentagon’s subsequent willingness in 2012 and 2013 to withhold some payments from the company, is one example. Last year, it did the same with helicopter manufacturer and major defense contractor Sikorsky.

But the extent to which the agency was failing to properly manage contracts for even its own internal systems is coming into focus this year with the April Inspector General report and the documents POGO obtained.
As mentioned above, this post presents only part of the story, the mistakes made. There is another story in the article about the investigation(s) and information obtained by POGO regarding the project and loosely related others. Here, I focus on what went wrong. The rest of the story focuses on the investigation and remedies. And that's the main point of the procurement system.

While we're here, let me put in a plug for the Project On Government Oversight. Our procurement system requires the essential efforts of the private sector to police government spending in real time. POGO is one of those many sentinels along the watchtowers we rely on to keep the game clean, as best we can.

Thursday, May 2, 2019

One for the Sages

Once again, Lexology provides grist for the procurement law this blawg mills. The particular grist here is an article by lawyers Hunter Bennett and Evan R. Sherwood of the firm Covington and Burling LLP. And, once again, you really must read the material at the links provided, and not rely on me to get it straight or accurate. I tend to omit matter, important matter, inject commentary, and frame or paraphrase, slice, dice and rearrange material, ala Frankenstein. Here, I sort of shuffled the article and the GAO decision together. So read each of them. For your own good.

Turns Out You Really Can Unring a Bell
GAO recently concluded that it was rational of an agency to unring the bell when taking corrective action in a bid protest. That is, take corrective action revisiting the original evaluation.

In Quotient, Inc., B-416473.4, Mar. 12, 2019, 2019 CPD ¶ 106,in response to an RFQ seeking to establish a Blanket Purchase Agreement, the Department of Education (“ED”) established a competitive range and then asked vendors technical questions about their quotations for a Federal Supply Schedule (“FSS”) order. Vendors responded and ultimately provided updated quotations. ED evaluated Quotient's competitor, Reingold, to offer a better quote. After award, Quotient, Inc. (“Quotient”) Filed a protest, one of a litany, essentially alleging that the first Technical Evaluation Panel ("TEP") was biased; it had treated the protester unfairly and had demonstrated an improper preference in its evaluation.

So, in response to Quotient’s protest, the agency advised that it intended to take corrective action by reevaluating all vendors’ technical quotations and making a new source selection decision. ED announced that it would take corrective action by ignoring the vendors’ updated quotes and making a new award decision based solely on the original submissions. To do so it constituted a totally independent Second TEP: it was not informed that its evaluation was based on corrective action following a bid protest. The Second TEP was not informed that there had been a previous evaluation, nor were they made aware of the earlier technical clarification questions or the vendors’ responses. Moreover, the reevaluation of technical quotations did not include consideration of vendors’ responses to the First TEP's technical clarification questions. In short, there was nothing in the record to suggest that, assuming the First TEP was tainted by favoritism (or repulsed by the protestor), there was no likelihood that the Second TEP was infected by the taint.

As a general rule, agencies have broad discretion to take corrective action where the agency has determined that such action is necessary to ensure fair and impartial competition. An agency’s corrective action need not address every protest issue, but must render the protest academic. An agency’s discretion when taking corrective action also extends to a decision on the scope of proposal (or quotation) revisions, and there are circumstances where an agency may reasonably decide to limit the revisions offerors or vendors may make to their submissions. The details of implementing the corrective action are within the sound discretion and judgment of the contracting agency, and we will not object to any particular corrective action, so long as it is appropriate to remedy the concern that caused the agency to take corrective action.

Before the Second TEP completed its evaluation or made a decision on the RFQ, Quotient protested the planned corrective action, this time arguing that ED had irrationally decided to ignore the revised quotations. The protester essentially argued that because its allegations regarding the agency’s technical evaluation are, in its opinion, meritorious, and because the agency’s corrective action here does not remedy these errors, the corrective action is thereby deficient. GAO agreed with the protester that the corrective action was a “quite uncommon” attempt to “unring a bell.” However, GAO found ED’s plan unobjectionable, stating that it could rationally “exclude consideration of” the revised quotes under the circumstances. GAO affords agencies broad discretion to take corrective action. Apparently because the agency had siloed the new evaluation panel, GAO concluded this was “a reasonable means of remedying a reasonable concern[.]”

Quotient also argued that its March 29 quotation was “withdrawn” by its April 30 technical clarification response, and that the agency may not make award based on withdrawn “proposals” (i.e., any attempt by ED to accept an original proposal would be null and void). Critically, this was an FSS (Federal Supply Schedule) procurement, meaning that the updated quotations were not binding “offers”. In FSS procurements vendors submit quotes, not offers. The GAO found that the decisions of its Office on which Quotient relies, for the proposition that the submission of a revised offeror extinguishes an agency’s right to accept an earlier offer, are inapposite here; instead, these decisions demonstrate the protester’s misunderstanding of the difference between a request for quotations and a request for proposals (RFP).

An RFQ, unlike an RFP (or an invitation for bids), does not seek offers that can be accepted by the government to form a contract. Rather, vendor quotations are purely informational. In the context of an RFQ, it is the government that makes the offer, albeit generally based on the information provided by the vendor in its quotation; and, no binding agreement is created until the vendor accepts the offer. A vendor submitting a price quotation therefore could, the next moment, reject an offer from the government at its quoted price. Because vendors in the RFQ context hold the power of acceptance, it simply does not make sense to apply the concept of offer and acceptance from our decisions discussing RFPs. Here, there is frankly no requirement that Quotient, or any other vendor, accept an offer made to it by the agency, whether such offer is based on a “withdrawn” quotation or on a technical quotation which may have incorporated prior clarifications.

GAO's prior decisions have considered the timing of protests challenging the propriety of an agency’s proposed corrective action. In doing so, in those instances where the agency’s proposed corrective action alters or fails to alter the ground rules for the competition (i.e., aspects that apply to all offerors or vendors), GAO has considered a protester’s challenge of such to be analogous to a challenge to the terms of a solicitation, thus providing the basis for protest prior to award. However, in those instances where the agency’s proposed corrective action does not alter the ground rules for the competition, we have considered a protester’s preaward challenge to be premature.

Inasmuch as the agency’s July 30 letter to Quotient made it clear that the technical reevaluation was going to be based on a quotation that Quotient believed withdrawn, GAO found any protest of this alleged impropriety had to be filed within 10 days thereof. Because Quotient did not file its protest challenging the agency’s decision to base its technical evaluation on an allegedly withdrawn quotation until December 3, the protest was untimely, and dismissed.

Monday, April 15, 2019

A practical difference between an assignment and a novation

“Then you should say what you mean,” the March Hare went on.
“I do,” Alice hastily replied;
“at least—at least I mean what I say—that's the same thing, you know.”
“Not the same thing a bit!” said the Hatter.
--Lewis Carrol, Alice in Wonderland

The following article reminds me of the differences between a lease renewal and a lease extension. Very many leases do not really think there is a difference. To add more duration to a fixed term, the parties may summarily make a lease "renewal" amendment rather than a lease "extension" amendment.

The consequences from such a choice of form is not unlike the consequences of using an assignment agreement rather than a novation. In my primarily real estate experience, I've seen more assignments made that maybe should have been made as a novation.

In both cases (assignment/novation and renewal/extension), the intended practical effect is the same or substantively similar whichever choice is made, but the legal effect may be unexpected.

The article presented for post came to my attention, as many do, from Lexology, and the article is found at the link provided below. As usual, be aware that I tend to shape and reframe the articles I present to suit a teachable moment consistent with this educational blog. I often omit critical material, such as citations or facts, rearrange, paraphrase, slice, dice and probably misstate the original work. So, by all means, read the article at the link.

An Amended and Restated Loan Security Agreement Should Expressly So State If It Is Not Intended As a Novation
An amended and restated loan and security agreement (“Amended Loan Agreement”) may have been a novation of the original loan and security agreement resulting in the loss of the lender’s security interest and making payments fraudulent transfers, according to Bash v. Textron Fin. Corp., 834 F.3d 651 (6th Cir. 2016). Evidently, the parties did not intend to extinguish the earlier lien by amending and restating the agreement.

(I should note, to tie in the lead-in comment, that parties who renew leases rather than extend them, can discover they, too, have made a new agreement, accelerating or otherwise affecting provisions of the lease, such as when to return the security deposit, as well as the statute of limitations on claims made on breaches of lease during the "original" term.)

Fair Finance Company (“Debtor”) and its holding company, Fair Holdings, Inc. (“FHI”) received a $22 million revolving credit line under the terms of a loan and security agreement in 2002 (“2002 Loan Agreement”) with Textron Financial Corporation (“Textron”) and United Bank. As security for the loan, FHI pledged all of its present and future assets. The security interest created under the 2002 Loan Agreement extended to all future obligations of FHI, including obligations intended as replacements or substitutions for those existing under the 2002 Loan Agreement.

As the 2004 maturity date for the 2002 Loan Agreement approached, all parties involved began discussions on whether to renew the loan. Textron bought out United Bank’s position and entered into an amended and restated loan and security agreement (“2004 Amended Loan Agreement”) with Debtor and FHI. The amended loan agreement said the parties intended to amend and restate the original agreement to reduce the amount and modify certain terms and conditions, as well as state a new interest rate, new fee schedule, new covenants, new events of default and new conditions precedent, among other critical matters.

In 2007, the Debtor and FHI used part of the proceeds from an asset sale transaction to pay the remaining balance to Textron under the 2004 Amended Loan Agreement. This payment ended Textron’s relationship with the Debtor and FHI, and Textron released all of its liens.

But 2009, the FBI raided the Debtor’s headquarters. After the Debtor’s operations collapsed, a petition for involuntary bankruptcy was filed against the Debtor. The bankruptcy trustee filed a claim against Textron to avoid and recover fraudulent transfers. The district court concluded as a matter of law that the 2004 Amended Loan Agreement was not a novation and, as a result, the security interest conveyed pursuant to the 2002 Loan Agreement continued in full force. Accordingly, neither the 2004 Amended Loan Agreement, nor the payments made under it, could qualify as transfers for the purposes of a fraudulent transfer claim.

On appeal of the district court's decision, the trustee argued that the lien granted under the 2002 Loan Agreement was nullified because the 2004 Amended Loan Agreement was a novation of the 2002 Loan Agreement, and that when the 2002 Loan Agreement was extinguished, so was the security interest granted under the 2002 Loan Agreement.

The Court of Appeals then examined the elements of intent, knowledge and consent to determine if there had been a novation of the 2002 Loan Agreement. The Court found support for a novation in: (1) the text of the 2004 Amended Loan Agreement, where several provisions evidenced the intent of the parties for the 2004 Amended Loan Agreement to extinguish and wholly replace the 2002 Loan Agreement; (2) circumstantial evidence, such as the timing of  the 2004 Amended Loan Agreement, which occurred at the maturity of the 2002 Loan Agreement, new promissory notes and guaranties were issued, United Bank ceased to be a lender; and (3) new terms in the 2004 Amended Loan Agreement, all of which the Court said signified the intent to extinguish the 2002 Loan Agreement.

When all the facts were examined together, the court found there existed an ambiguity as to whether the parties intended the 2004 Amended Loan Agreement to extinguish the 2002 Loan Agreement, so it reversed and remanded the case for further proceedings. (Read to mean, lots more time and legal fees lost.)

The practical takeaway is that an amended and restated agreement should expressly state the intent of the parties that the security interest and liens in the collateral under the original security agreement continue in full force and effect and that the amended and restated agreement is not intended to be a novation.
I'd add, make clear your intent when making any transfer whether you use the term "assign", "novation", "renew" or "extend". A few extra words can avoid the very expensive and expansive process of litigating the facts to prove an intent inferred by one of those terms.

Some possibly helpful definitions from Black's Law Dictionary:

Assignment: "The act of transferring to another all or part of one's property, interests or rights."

Novation: "A type of substituted contract that has the effect of adding a party, either as obligor or obligee, who was not a party to the original duty. Substitution of a new contract, debt, or obligation for an existing one, between the same or different parties. The substitution by mutual agreement of one debtor for another or of one creditor for another, whereby the old debt is extinguished. A novation substitutes a new party and discharges one of the parties to a contract by agreement of all parties."

Renewal: "A revival or rehabilitation of an expiring subject; that which is made anew or re-established. The substitution of a new right or obligation for another of the same nature. A change of something old to something new."
But note additional interpretations of the word 'renewal' that expresses the confusion with an extension: "To grant or obtain extension of; to continue in force for a fresh period....; An extension of time in which that obligation may be discharged."

Comment: These additional meanings seem to derive from trading in financial and security instruments (chattel property), whereas leases of land involve estates, and a different branch of law with entirely different origins and complexities.  See, "Extension or renewal of note: "Takes place when parties agree upon valuable consideration for maturity of debt on day subsequent to that provided in original contract."]
Extend: "Term lends itself to great variety of meanings, which must in each case be gathered from context. Expand, enlarge, prolong, lengthen, widen....

Extension: An increase in length of time specified in contract.

Extension of Lease: "The word 'extension' when used in its proper and usual sense in connection with a lease means a prolongation of the previous leasehold estate. The distinction between 'extension' and 'renewal' of lease is chiefly that, in the case of renewal, a new lease is requisite, while, in the case of extension, the same lease continues in force during additional period upon performance of stipulated act."

Note that a lessee's assignment of a lease "without recourse against the assignor", or an assignment and release of transferor, which is agreed to by a landlord, has the same practical effect as a novation, inasmuch as it achieves a discharge of the obligations of the transferor, as in a novation.


Tuesday, April 9, 2019

When it's not best left unsaid

Government contracting by implication. It's what you do when you've left home without it, it being a critical government contract clause, required by the procurement law, including its regulations. Now I know, thanks to Lexology and Attorney Edward Arnold and the article below.

The Christian Doctrine: The Double-Secret Contract Clause
The typical government contract contains a laundry list of standard Federal Acquisition Regulation (FAR) or Defense Federal Regulation Acquisition Supplement (DFARS) clauses that outline the requirements for the construction or services to be provided. These clauses are either expressly stated, i.e. written out in full length in the contract, or incorporated by reference to a particular provision which the contractor must research for the specific language. But contractors beware: not all contracts are what they seem. Since 1963, courts have held that certain clauses are so integral to public procurements that they are deemed incorporated by operation of law, even if they are omitted from the contract.

The “Christian Doctrine” arises from the Court of Claims’ 1963 decision in G.L. Christian & Associates v. United States.[1] The contractor there sought to recover anticipated profits on a contract that terminated by the U.S. Department of the Army. The government sought to avoid liability for anticipated profits, relying on the standard termination for convenience clause, which disclaims government liability for anticipated profits on unperformed work. Interestingly, the termination for convenience clause was not referenced or incorporated in G.L. Christian’s contract. The government argued that, despite its absence, the clause should be read into the contract as a matter of law. In support of its argument, the government relied on Section 8.703 of the Armed Services Procurement Regulations (“ASPR”), which requires the termination clause be inserted in all fixed-price construction contracts such as the one at issue.[2] The Court agreed, stating that since World War I, the limitation on anticipated profits in a termination case was “a deeply ingrained strand of public procurement policy.”[3]

Following this ruling, various boards of contract appeals and courts took a relatively broad view of the court’s holding, incorporating clauses and procurement regulations with little or no consideration for whether such provisions reflected a deeply ingrained strand of public procurement policy. Thus, a series of ancillary clauses were deemed incorporated by operation of law, even though they were not in the contract. For example, one case from the Court of Claims held that the ASPR “Mistake in Bids” clause was incorporated by law into the contract based on a theory that: “If a regulation appears intended to define and state the rights of a class of persons, it is presumptively intended to benefit those persons.”[4] The Court ruled that the missing clause was intended to benefit bidders, without any analysis as to whether that end was a deeply ingrained in the federal procurement scheme.

In 1993, the Court of Appeals for the Federal Circuit addressed the expanding scope of the Christian Doctrine in General Engineering & Machine Works v. O’Keefe.[5] Emphasizing Christian’s reliance on the significant and long-standing policy implemented by the termination for convenience clause, the Court re-iterated that “the Christian Doctrine does not permit the automatic incorporation of every required contract clause.”[6] Rather, “the Christian Doctrine applies to mandatory contract clauses which express a significant or deeply ingrained strand of public procurement policy.”[7] In the wake of General Engineering, one set of commentators noted: “They [the courts and boards] have been saved for the last 20 years by being able to mechanically follow the Christian Doctrine to incorporate all mandatory clauses in the contract without analysis or thought. But that day is over. Under the guidance provided by the Federal Circuit, the boards of contract appeals now have to think through each case to determine if the clause meets the General Engineering tests.”[8]

Under the guidance of General Engineering, the Armed Services Board of Contract Appeals (ASBCA) has invoked the Christian Doctrine only twice to incorporate clauses into contracts. And even so, the ASBCA only incorporated clauses that had been previously incorporated under earlier case law.[9] In that same time, the ASBCA has refused to invoke the incorporate various other clauses.[10]

In its most recent decision involving the Christian Doctrine, the Federal Circuit held for the first time that bonding requirements in FAR Part 52.228-15, “Performance and Payment Bonds—Construction,” were incorporated in every construction contract at the time of award.[11] Not only did the Court find that the purposes of the performance and payment bonds rendered them “a significant or deeply ingrained strand of public procurement policy,” it was also persuaded by the fact that government property cannot be subject to subcontractors’ and suppliers’ mechanic’s liens.[12] Thus, protecting subcontractors and suppliers represents a deeply ingrained strand of public procurement policy.

The lesson of K-Con: Federal contractors of all sizes must understand: (1) what type of contract is being contemplated by the government’s solicitation; (2) which provisions are found in those types of contracts; and (3) which provisions have been, or may be, deemed incorporated by operation of law even if not present in the contract. This will greatly impact how contractors price their proposals in competitive solicitations to better account for potential risks.
The article comes with a very organized and helpful matrix of over 40 administrative and judicial decisions, showing whether the decision followed or rejected the Christian Doctrine on the facts of the respective cases. This proved helpful to me as I was able to get a lead to two decisions concerning the incorporation of the standard federal and ABA Model Procurement Code Contract Dispute Clause models. Both of them followed the Christian Doctrine.

My interest arises from two separate procurement controversies that have been playing out here on Guam, that turned into binding arbitration train wrecks. I have been puzzled by that. Guam has the ABA MPC version of the contract dispute clause. Although the regulations elaborate, the essence is in the law, 5 GCA § 5427:
§ 5427. Authority to Resolve Contract and Breach of Contract Controversies.
(a) Applicability. This Section applies to controversies between the Territory and a contractor and which arise under, or by virtue of, a contract between them. This includes without limitation controversies based upon breach of contract, mistake, misrepresentation, or other cause for contract modification or rescission.
(b) Authority. The Chief Procurement Officer, the Director of Public Works, the head of a purchasing agency, or a designee of one of these officers is authorized, prior to commencement of an action in a court concerning the controversy, to settle and resolve a controversy described in Subsection (a) of this Section.
(c) Decision. If such a controversy is not resolved by mutual agreement, the Chief Procurement Officer, the Director of Public Works, the head of a purchasing agency, or the designee of one of these officers shall promptly issue a decision in writing. The decision shall:
    (l) state the reasons for the action taken; and
    (2) inform the contractor of its rights to judicial or administrative review as provided in this Chapter.
(d) Notice of Decision. A copy of the decision under Subsection (c) of this Section shall be mailed or otherwise furnished immediately to the contractor.
(e) Finality of Decision. The decision reached pursuant to Subsection (c) of this Section shall be final and conclusive, unless fraudulent, or the contractor appeals administratively to the Public Auditor in accordance with § 5706 of this Chapter.
(f) Failure to Render Timely Decision. If ... one of these officers does not issue the written decision required under Subsection (c) of this Section within sixty (60) days after written request for a final decision, or within such longer period as may be agreed upon by the parties, then the contractor may proceed as if an adverse decision had been received.
It seems to me that the requirement of mutual agreement by the parties precludes arbitration, and certainly the requirement that a disputed final agency decision must be appealed (first administratively, from which further appeal procedures are available, ultimately to the Guam Supreme Court), renders binding, non-reviewable arbitration clearly out of the question.

Yet, those two, very large (on Guam scale) contract disputes ended up in arbitration -- and litigation, adding insult to injury, and costs.

It should be noted Guam's Procurement Contract Disputes law is fortified by a strongly stated government policy in favor of resolution of "all controversies by mutual agreement without litigation", and backed up by a quite specific "Disputes" clause which "shall be inserted in all territorial contracts".

I could not square the arbitrations with that contract clause requirement. Obviously, someone(s) somewhere along the line neglected or resolved not to abide by the mandatory dispute resolution procedure explicitly mandated in law and regulation. A law and regulation, I might add, that has been ensconced in Guam's procurement law from the beginning of the comprehensive procurement law's adoption in 1982.

Needless to say, I have been plowing that Christian Doctrine field since coming across the article above and amassed a goldmine of resources should I ever need to have it to hand.

Such is the aspiration of a Procurement True Believer. Or nerd. Whatever.

Helpful to me, among others:
Yosemite Park v. United States, 582 F. 2d 552 - Court of Claims (1978)
SJ Amoroso Const. Co., Inc. v US, 12 F3d 1072, Court of Appeals, Federal Circuit (1993)
Bay Shipbuilding Company vs Dept. HomeLand Security, CBCA 54, 84 (2007)
US v Thomas K. Mills, MD, Court of Appeals, 3rd Circuit,822 F.2d 373 (1987)



Thursday, February 21, 2019

The risky business of outsourcing essential government services

Britain to tackle doubts about outsourcing risks with new guidelines
Britain, which hires private firms to run parts of its health service, schools, prisons and public transport, has been rethinking how it awards contracts after the collapse of contractor Carillion just over a year ago. Carillion became the largest construction bankruptcy in British history last year, leaving creditors and pensioners facing steep losses and putting thousands of jobs at risk. Its demise reduced the number of big corporate bidders for government contracts and increased scrutiny of how the sector is run, driving down share prices of firms that provide outsourcing services, such as Babcock, Capita, Serco, G4S, Mitie and Compass.

Britain’s government will take measures to identify and reduce risks taken by private firms that provide public services, it will say on Wednesday, in a bid to encourage companies that have become increasingly wary of taking on new government business. “A more considered approach to risk allocation will make us a smarter, more attractive client to do business with,” cabinet office minister Oliver Dowden will tell business leaders at the Confederation of British Industry on Wednesday.

Guidelines, set out in the “Outsourcing Playbook”, will specify that “when designing contracts, departments must seek to mitigate, reduce and then allocate risks to the party best able to manage it”, Dowden will say, according to a text of his remarks released before delivery. The aim is to improve how government works with industry and deliver better public services by, for example, piloting services needed in advance and publishing details of work departments will require, so companies are better able to plan.

Public departments will also be required to say when it is best to deliver public services in-house or when there is benefit from drawing on private sector expertise.
Read this and other articles at the link(s) provided; I tend to slice and dice, rearrange, omit, paraphrase and pretty much destroy the integrity of the original work to try to create a teachable moment fitting the context of this blog.

Professor Steven L. Schooner, of the George Washington Law School, has asked, "what does your government hope to achieve through its government procurement law? It seems reasonable to attempt to describe general aspirations for a procurement system before drafting begins." In a paper he wrote, published in the Public Procurement Law Review in 2002, he identifies the principle of "risk avoidance" as one of nine particular desiderata often mentioned for a successful procurement regime.
It is difficult to describe a procurement regime without acknowledging the role of risk avoidance. Avoiding undue risk is a fundamental responsibility of any governing body. Conversely, improper obsession with risk avoidance can suffocate creativity, stifle innovation and render and institution ineffective. Further, there are infinite mechanisms available to control different types of risk.

No system can fully achieve all of the nine goals. Nor can a state expect that its objectives for its system will remain constant over time. Determining which goals are most important is a daunting, ever-evolving challenge. Because no system can achieve all of the goals, your desiderata entails important tradeoffs. Ultimately, each government must decide how much discretion or flexibility it wishes to delegate to its buyers.
Prof Schooner applied that principle of risk avoidance in testimony before the United States Senate, Committee on Homeland Security & Governmental Affairs, in 2007, commenting on "the benefits, challenges, and risks of agencies’ increased reliance on contractors to provide critical services". He noted:
The challenges associated with extensive contractor reliance include, among others: (1) planning, which includes understanding what outcome will be sought from the private sector; (2) both understanding and accurately describing that outcome (or task) to the private sector; (3) selecting appropriate, qualified contractors in a timely fashion; (4) negotiating cost-effective agreements and drafting clear contracts that contain effective incentives (or profit mechanisms) to maximize contractor performance; (5) managing the contractual relationship to ensure that the government receives value for its money; (6) providing appropriate oversight throughout the process to, among other things, avoid corruption; and, most importantly, (7) maintaining a sufficiently educated, experienced, and motivated government workforce (or augmented workforce) to take on these challenges.

These challenges can be difficult to accomplish because the combination of government recruiting policies, salaries, benefits, opportunities, and quality of work lag much of the private sector, particularly in high-demand career fields. Thus, the “market” reflects that the government undervalues critical skills.

By the same token, slavish focus upon the relative cost of contractor support is misguided. Specifically, it is not productive to criticize agencies for paying contractors “too much” without: (1) permitting an agency to hire additional personnel; (2) confirming that sufficient personnel are available in the marketplace and willing to work for the government; (3) comparing “apples to apples,” such as taking into account all of the costs of civil servants or members of the armed services; and (4) considering critical issues such as flexibility and surge capacity. For example, higher contractor salaries may be offset, at least in part, by long-run costs avoided. Indeed, a strong case could be made that, for short-term demands for additional resources, it makes sense to pay higher, and potentially significantly higher, amounts for contractor support.

Fundamentally, though, it is difficult to conceive of a higher priority for a heavily outsourced agency than to “assess program office staff and expertise
necessary to provide sufficient oversight” of its most important service contracts. And, empirical evidence is scant to demonstrate that government employees are more talented, committed, motivated, or honest than their private sector counterparts, and vice-versa. However, the private sector’s exposure to market forces, and the related corporate purpose of pursuing profit, permits (and, arguably, requires) a more diverse and potent arsenal of employee incentives and disincentives. These tools include compensation (salary, salary increases, bonuses, stock incentives), opportunity for advancement, and, of course, the risk of termination. While the Government can use similar tools, their impact (or the degree to which these tools can influence behavior) is at least perceived as far less dramatic, given a heavily constrained promotion and bonus regime and an impenetrable de facto tenure system. The private sector-government contrast is greatest at the extremes. The private sector offers far greater economic rewards for success and threatens more credible sanctions for less than desirable performance.

Ultimately, however, the debate between in-house services or privatized services is increasingly academic. The government today relies on the private sector because we have restricted the size of government or, more specifically, the number of government employees. The government currently has no short-term choice but to rely upon contractors for every conceivable task that it is understaffed to fulfill. It is not an option to consolidate its missions, jettison a number of its tasks, terminate contracts, and take on only those missions it is appropriately staffed to perform. Nor is it feasible to wait while it embarks upon an aggressive program to identify, recruit, hire, and retain an extraordinary number of civil servants.

Only serious, long term, far reaching personnel reforms can, in any meaningful manner, begin to reverse the current trend. Accordingly, the government must continue to expend its best efforts to achieve its mission with the resources available, acknowledge that it is a rather “hollow” agency, and invest significant energy and resources in improving its use of contractors to help it achieve its mission. This involves conceding that contractors will continue to perform what historically have been perceived as inherently governmental functions. But even that notion is becoming increasingly quaint, outmoded, anachronistic, or simply irrelevant. At least, that is, until our increasing reliance on contractors to perform services for core government activities is matched by the capacity of government officials to supervise and evaluate the performance of these activities.

As our procurement system has struggled throughout this decade, Congress has been quick to call for more auditors and inspectors general to scrutinize contracting. That’s a responsible gesture. But the corresponding call – for more contracting experts to perform the many functions that are necessary for the procurement system to work well – has been both delayed and muted. In order to serve the taxpaying public and meet the needs of agency customers, acquisition professionals must promptly and accurately describe what the government wants to buy, identify and select quality suppliers, ensure fair prices, structure contracts with proper monetary incentives for good performance, and manage and evaluate contractor performance. Accordingly, the contracting workforce – understaffed, under-resourced, and under-appreciated – desperately requires a dramatic recapitalization.

We have witnessed an explosive growth in what we refer to as body shop or employee augmentation arrangements. As the name implies, the government uses this type of contract to hire contractor personnel to replace, supplement, or work alongside civil servants or members of the armed forces. Civil servants work alongside, with, and at times, for, contractor employees who sit in seats previously occupied by government employees. Unfortunately, no one stopped to train the government workforce on how to operate in such an environment. Worst-case scenarios have arisen where contractors have performed work under an
open-ended contracts (e.g., with a vague or ambiguous statement of work) without guidance or management from a responsible government official.

More than fifteen years of ill-conceived under-investment in the acquisition workforce, followed by a government-wide failure to respond to a dramatic increase in procurement activity has lead to a triage-type focus on buying, with insufficient the resources available for contract administration, management, and oversight. The old adage – an ounce of prevention is worth a pound of cure – rings true. More auditors and inspectors general will guarantee a steady stream of scandals, but they’ll neither help avoid the scandals nor improve the procurement system. Conversely, a prospective investment in upgrading the number, skills, and morale of government purchasing officials would reap huge dividends for the taxpayers.